Khyber Pakhtunkhwa Reconstruction Program USAID funded

S.No Activity Budget (USD)
MILITANCY DAMAGED INFRASTRUCTURE
1 Reconstruction of Schools 25.000
2 Health Reconstruction and Rehabilitation 6.048
3 Water & Sanitation Systems 3.000
4 Enhancing Govt Capacity 6.100
  4.1  Capacity Building of PaRRSA 3.600
  4.2  Tehsil Complex Kabal 2.500
FLOOD DAMAGED INFRASTRUCTURE
5 Rehabilitation / Reconstruction of Amandara head works 6.564
6 Rehabilitation / Reconstruction of Munda head works 8.495
7 Reconstruction of Khwazakhela and Mingora Bridge 4.980
8 Reconstruction of Schools (Floods / Militancy) 25.000
Total : 85.187

Progress of Schools (US$ 50 M)

Overall target of 121 Schools have been set for reconstruction with USAID financial support. Till September 30, 2016, 109 Schools have been completed and 103 provided with furniture while remaining schools are in various stages of reconstruction and approval process.
Another 62 Flood / Militancy damaged schools have been approved by the competent forums in 08 districts. Supervisory consultant has been mobilized. Work orders for 36 schools have been issued while the remaining are in the process of evaluation. Moreover assessment of remaining schools against the balance amount is in process. PC-I of GHSS Akbarpura Nowshera has been approved and pre-qualification of contractor is in progress. 

SUMMARY
S.No District Total No of Schools Approved from respective forum Completed Ongoing
1 Swat 81 81 77 04
2 Buner 14 14 11 03
3 Dir Lower 24 24 19 05
4 Dir Upper 02 02 02 -
Total : 121 121 109 13

62 Flood / Militancy Damaged Schools Detail

SUMMARY
S.No District No of Schools Ongoing
1 Charsadda 06 Approved
2 Nowshera 09 -do-
3 D.I Khan 06 -do-
4 Swat 11 -do-
5 Dir Lower 11 -do-
6 Malakand 03 -do-
7 Dir Upper 09 -do-
8 Shangla 07 -do-
Total : 62  

Progress of Fully/Partially Damaged Health Facilities and Malakand Health Services Plan - (US$ 6.048 M)

S# Name of Scheme Total No of Health Facilities Completed Ongoing
1 Reconstruction of BHUs 05 04 01
2 Rehabilitation of Health facilities 08 05 03
3 Provision of furniture and Equipment to health facilities (MHSP) 47 47 00
 Total 60 56 04

Malakand Health Services Plan (MHSP)

  • Bridge Financing for the revolving fund  has been approved by the Government.
  • The timeline of Health Services Plan will be curtailed from three years to two years.
  • The same activities will take place with the obligated USAID financial assistance.         
  • Presently the PIL is under revision with USAID.

Water Supply Schemes Buner & Swat - US$ 3 M

S.No. Name of scheme Total No of Schemes Completed Ongoing
1 Drinking Water Supply Schemes Buner 13 06 07
2 Drinking Water Supply Schemes Swat 10 00 10
Total 23 06 17

Tehsil Complex Kabal US$ 2.5 M)

  • USAID has committed an amount of US$ 2.5 Million for construction of Tehsil Complex Kabal.
  • Land provided by the District Administration.
  • PC-I approved, AA issued at a total cost of Rs.255.011Million. However, Raft footing/foundation design of Package-I & II has been completed and layout is in process.
  • Contractors and supervisory consultants have been mobilized for reconstruction of Tehsil Level Complex Kabal Swat.  

Restoration of flood damaged Infrastructure (US$ 20.039 Million)

  • Restoration of Munda Headworks (US$ 8.495 M) is completed.
  • Restoration of Amandara Headworks (US$ 6.564) is completed.
  • Reconstruction of Khwazakhela Bridge and Mingora Bridge are completed and opened for general traffic - (US$ 4.980 M).

Housing Uniform Assistance Subsidy Project US$ 65 Million

  • USAID funded Uniform Housing Assistance Subsidy Project (US$ 65 M).
  • Subsidy for Fully damaged house Rs. 400,000/-.
  • Subsidy for Partially damaged house Rs. 160,000/-.
  • Rs.2265.04 millions disbursed in Malakand Division till date.


Area  Total Houses Total Houses Subsidized Subsidy Amount (Rs in Million) Progress
Malakand 10,788 10021 Rs.2265.04 millions 98.340%

Prime Minister/ Chief Minister Package

S.No Sector Est. Cost Remarks
1 Communication (Roads) 252.06 CM Package
2 Irrigation (Civil Channels Swat) 300.45 CM Package
3 Public Health Engineering (DWSS) 136.54 CM Package
4 E&S Education 479.06 CM Package
a Other than Malakand Schools 215.57  
b Excelsior College (school) 174.45  
c Sangota School 89.04  
5 Integrated NRM Project (INRMP) 200.00 CM Package
6 Southern Districts 90.00 CM Package
7 Communication 9 roads 269.53 PM Package
8 Purchase of land for Madian road 95.78 PM Package
9 Islampur Road 36.41 PM Package
10 Restoration of Guide Bund on River Swat 6.50 PM Package
11 Afzal Khan Lala College 69.26 PM Package
12 Uncommitted 64.42  
TOTAL : 2000.00 M

Background of PM / CM Package:

PaRRSA paid Rs. 1.522 billion for Housing Subsidy for Malakand Division out of Rs. 2 Billion grant provided by the Federal Government. Later on the USAID committed US$ 65 Million (PKR 5.5 Billion) for the Malakand Housing Subsidy out of which US$ 24 Million (Rs. 2.040 Billion) has been released to the Provincial Government/PaRRSA by the USAID.

The available amount of Rs. 1.522 Billion, recouped from the USAID funding was approved by the Chief Minister Khyber Pakhtunkhwa on 13.8.2011 to be spent on rehabilitation and reconstruction activities in Malakand Division.

Chief Minister's Package PKR 477.47 M (Phase – I)

  • Reconstruction Islampur Road PKRs. 46.41.
  • Afzal Khan Lala College PKRs. 69.26.
  • Communication 9 Roads PKRs. 269.53.
  • Purchase of land for Kanju Madian Road PKRs. 95.78
  • Reconstruction of Guide Bund on River Swat PKRs. 6.50

Prime Minister's Package PKR 1.522 Billion (Phase – II)

  • Reconstruction of Excelsior College - Rs. 175 M.
  • Reconstruction of Sangota School - Rs. 90 M.
  • Rehabilitation of 6 roads - Rs. 252 M.
  • Rehabilitation of 19 Irrigation Systems - Rs. 300 M.
  • Rehabilitation of 13 WSS - Rs. 137 M.
  • Other than Malakand 17 Schools - Rs. 215 M.        
  • INRM Project - Rs. 200 M.